Steam Drum Section Replacement
In February
of 1998 Troy Boiler Works began a complete circumferential replacement
of a center section of the steam drum of a 100,000 #/hr Erie
City water tube boiler. The boiler, with a design pressure of
922 PSIG (at 565 degrees F), supplied steam for an area paper
plant.This replacement was necessary because of a heat stressing
in a section of the original drum. A replacement boiler would
have been much more costly, and would have taken many months
to arrive at site.
Repairs of this type are one of a kind so many factors had to
be considered in this critical work. This included bracing the
original structure before cutting out the bad section, forming
and machining the new section, properly beveling the new and
old sections, rigging the new section into place, aligning the
drum sections, properly welding the drum sections together,
and heat-treating the weld areas in place.
When all was said and done, the steam drum was within 1/16"
level along its 40' length and the customer's equipment was
back on-line, safely running with a quality repair.
|
|

| 2-3/4" Thick
Boiler Steam Drum Section |

| Welding The Root
With Pre-heat |

| Steam Drum Welded
Complete |
|